5.09.2010
Roof and windows
April 30, 2010
The majority of our windows were installed today! The roof was completed a few days ago, and we love the dark charcoal tone.
The master bathtub!
Can lights in the vault of great room. The cut out is of the second level loft.
Kitchen windows! The plumbing was also completed; you can see the red and blue tubes sticking out of the floor.
Great room windows
And finally....our circle and arch windows were cut by the framers! Later this week, the cement for the front porch is scheduled to be poured.
Stella's first visit
April 24, 2010
We took Stella to see the construction for the first time today! Nick carried her across the threshold because of our muddy front yard.
And she was also carried down the primitive stairs; the last thing I need is a pup with a head injury!!
Stella loves the tub already!
Electrical lines are everywhere! A few of the can lights are visible in the upper left corner.